Public Spaces Vimperk – 1. máje and Pivovarská Streets

Public Spaces Vimperk – 1. máje and Pivovarská Streets 2017

The area in question, 1. máje street and Pivovarská street, can be called the backbone of the town of Vimperk. It forms an essential axis in the east – west direction. It leads from the periphery gradually to the historic center. Several important streets open into the axis, which divide it into tracts and create small squares at the intersections.

The importance of this axis is confirmed by the location of educational, cultural, administrative, commercial and sports institutions. In the historic, more densely built-up part is a lively commercial parterre.

Currently, most public spaces are usurped by car transport. Staying and walking is unpleasant and sometimes even dangerous for pedestrians. Not only the large number of parking spaces, but especially their unsuitable organization causes a feeling of chaotic arrangement and intensifies the inconvenience of walking.

The design changes this situation, preferring pedestrians to motorists. It adjusts the widths of sidewalks, streets, intersections, and populates the streets with rows of trees, new public lighting and urban furniture.

The territorial study for the entire area was prepared in 2017. In 2020, the implementation of the 1st stage was started – 1. máje street.

Project name:
Territorial study Vimperk Public Spaces - 1. máje and Pivovarská Streets
Client:
The town of Vimperk
Address:
1. máje and Pivovarská streets, Vimperk
Type:
public space
Study:
2017
Realization:
2020-2021 1. etapa
Investment costs:
CZK 52 million - 1st stage
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
landscape solutions - symbio studio / Marie Gelová
transport solutions - Květoslav Syrový
Restoration of the Historical Part of Děčín – Podmokly 2013

Restoration of the Historical Part of Děčín – Podmokly 2013 2013

This is a proposal for the renovation of all public spaces in the Podmokly district in Děčín. The overall concept of the transport solution, the arrangement of the streets, the square, the solution of the new planting is implemented in stages.

In most streets of Podmokly is proposed 30 km/h zone, two-way traffic, give way to the right rule. Street crossings are elevated to facilitate movement of pedestrians. The proposal defines the use of individual squares and applies this to their design.

Overall, the proposal seeks to define a quality “standard” of public space solutions that is not overwhelmed by “creative ideas”. All the sophistication is hidden in the details and in the seemingly hidden solutions. The benches are extra long. Street lighting shafts unusually thin. Tree alleys underline the axial arrangement of the Cartesian grid.

After winning the competition, a territorial study was completed for the entire area, and now the individual stages of the plan are gradually being processed and implemented.

Project name:
Restoration of the Historical Part of Děčín – Podmokly
Client:
Statutory city of Děčín
Address:
Podmokly, Děčín
Type:
public space
Competition:
2013 - 1st place in a public architectural competition
Study:
2014
Realization:
2018-2020
Solved area:
10500m2
Investment costs:
CZK 55 milion
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Ida Chuchlíková
dopravní řešení - Květoslav Syrový
krajinářské řešení - Trevisan ateliér + / Jitka Trevisan
HIP - PK Vaner / Martin Cimburek, Luboš Vaner, Jan Vaner
Swimming pool

Swimming pool 2015

We are presenting the design of a new swimming pool in the suburbs Václavské předměstí  as a response to a double assignment. The demand for a new rational and economical construction of the city’s indoor swimming pool with an outdoor area and the solution for the space in front of football fields, adjacent to the track and the E49 road.

It is a solid and generous building with a pair of indoor pools, which is open south to the meadow and outdoor pool. The pool has a large sign – a logo that draws attention to the pool passengers passing along the nearby 1st class street. The pool is located outside the floodplain.

Project name:
Swimming pool
Client:
The town of Písek
Address:
Písek
Type:
sport / education
Competition:
2015
Project status:
completion
Enclosed room:
29800
GFA:
2550
Investment costs:
CZK 217 million
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Tomáš Feistner, Ondřej Pchálek, Vojtěch Ružbatský
Reconstruction of the Cinema Varšava

Reconstruction of the Cinema Varšava 2015

The first stage of the reconstruction concerns the foyer of the cinema building, built in Liberec in 1923 by local architects Effenberger and Noppes. The construction of the “Cinema Café” in the Cinema Varšava was the first stage of civic activity, which sought to repair the dilapidated building of the last city cinema, participate in the creation of local culture and create a federal house in the renovated building. The original building has a number of architectural qualities, the basic house layout makes appropriate use of the dramatic view of the Liberec terrain.

The design and implementation arose from the voluntary activities of the association, were influenced by the quality of the original building and were created with the knowledge that the funding for the construction is obtained by the association, the contribution of the city and the region, but mainly from public collection and supporting local companies.

Project name:
Cinema café, reconstruction of the foyer of the cinema Varšava in Liberec
Client:
Statutory city of Liberec, Liberec region, Association Let's save the cinema Varšava, citizens of Liberec by public collection, many companies from the region as sponsors
Address:
Frýdlantská 285, Liberec
Type:
interior
Study:
2014
Realization:
2015
Enclosed room:
920
GFA:
300
Investment costs:
CZK 3.2 million
Team:
Association Let's Save the Cinema Varšava / Petr Hubáček, Zuzana Koňasová, Ondřej Pleštil, Jiří Žid

color solution - Rudolf Hůlka
statics - Karel Otřískal
TZB - SIL / Milan Klogner, Marin Pelc
vytápění - Jiří Plánička
požární řešení - Petr Kohout
rozpočet - Propos / Antonín Buchar

dodavatel - E11 s.r.o, spolek Zachraňme kino Varšava
Federal House and Gazebo Pod Kaštany

Federal House and Gazebo Pod Kaštany 2015

The new buildings of the federal house and gazebo are located on the grassy square Pod Kaštany. The spot is adjacent to the main road passing through the village and the St. Wenceslas pilgrimage is traditionally held there. This pair of buildings borders the plaza and at the same time turns into it. Federal house with a row of high glass doors, gazebo with a covered deck. The layout scheme works even if only one of the buildings is built. A new house will always dominate the Pod Kaštany area.

 

The location for placement of the Federal House and the wooden gazebo was selected in the architectural concept, which we developed in 2013.

Project name:
Federal House and Gazebo Pod Kaštany
Client:
Municipality Úsilné
Address:
Úsilné
Type:
public administration and community
Study:
2015
Project status:
completion
Enclosed room:
6350
GFA:
1300
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Ida Chuchlíková, Tomáš Feistner, Kateřina Gloserová, Klára Pavlištová