Modifications of public spaces in the center of the municipality Statenice

Modifications of public spaces in the center of the municipality Statenice 2019

There are several buildings, spaces and institutions in the vicinity of the Statenice square that play or in the future may play an important social role in the village and co-create its center.

The intention is that the individual parts are clear in their function and at the same time, co-create a strong and functional whole. What does it mean? Simply, for example, that every passer-by knows where he is and what the village square is. That he understands what the purpose of the village square is and finds the municipal office where he expects it to be, including finding the entry to it. In addition, it means that the user is just as intuitively oriented inside the building. However, clear orientation is not the only goal.
The second goal needed to be mentioned is to create a space for any occasion – that the correct setting of the space initiates events that we can only imagine at the moment. Whether it’s a pilgrimage in the castle garden, birthday parties or an open-air wedding. However, we do not only accommodate large events. We create spaces that encourage you to stay in the center on the way from school or work. To hang out with a bottle of beer in front of the grocery store or by the creek. Overall, it is important that the village square or the center is lively (which does not mean the permanent presence of carousels and crowds though).

We propose to calm traffic in the center of the village by introducing a 30 km/h zone from the narrowing of Statenická street near the castle to Sokolovna. We then “connect” the individual parts of the mentioned mosaic to it.

Part of the design is to verify the location of the town hall building, shop, community center, kindergarten and verify the possibilities of the Sokol gym building.

Project name:
Modifications of public spaces in the center of the municipality Statenice
Client:
Obec Statenice
Address:
Obec Statenice
Type:
urban concept
Competition:
2019 - 1st place in the invited architectural competition
Project status:
completion
Solved area:
7200 m2
Enclosed room:
12800
Investment costs:
83 mil. Kč
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Dušan Sabol, Tereza Šipková, Alžběta Widholmová
landscape solutions - symbio studio / Marie Gelová
transport solutions - Květoslav Syrový
Study of Municipality Středokluky

Study of Municipality Středokluky 2019

Proposal for the location of several important municipal buildings – primary school, municipal office, fire station, federal premises and collection yard with technical services, including modifications to selected public spaces.

We performed a revision of the designated location of the construction program. We verified its spatial requirements, connections and context, even in relation to the expected development of the village.

We propose the appropriate location and premises for individual parts of the program. A clear arrangement of public spaces and a clear layout of new buildings is important to us.

We are placing the municipal office in the area of the current Technical Center of the municipality, which together with the Fire station, the federal premises will become the new Administrative and Social Center of the municipality. In this way we respond to the planned development of the village to the southwest.

We place the technical and collection yard near the wastewater treatment plant. The elementary school logically gets the entire original campus, including the garden.

Project name:
Center of Municipality Středokluky
Client:
Municipality Středokluky
Address:
Středokluky
Type:
urban concept
Competition:
2019 - 2nd place in a public architectural competition
Project status:
completion
Solved area:
6020 m2
GFA:
2120
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Vojtěch Ružbatský, Dušan Sabol, Tereza Šipková, Alžběta Widholmová
landscape solutions - symbio studio / Marie Gelová
transport solutions - Květoslav Syrový
Mnichovo Hradiště Bus Station

Mnichovo Hradiště Bus Station 2017

New-build bus terminal near the train station. It is a terminal with a two-way entry and an exit for buses. Five platforms in a row adjoin the railway station by the edge of the boarding platform.

The paved pre-station area is lined on the south by the station building, on the west by a wall with benches and a Bike+Ride area, on the northwest a park at Jana Švermy street leads to it, on the northeast is a restaurant with a corner bay window and on the east an allée. In this allée we keep the maximum of mature trees and supplement them with new plantings. The allée separates the terminal from the villas in Dvořákova street and provides shade for parked buses and cars.

It is important for us to perceive the main direction of walking when getting off the train or bus, i.e. Jana Švermy street with the adjacent park towards the cinema and further to the square, which co-creates the impression of the bus station. From the south-eastern corner, a pedestrian path from Harantova street leads to the area, complementing the third green axis, which opens into this area.

The design also includes covered waiting rooms, which in their form refer to the historical tubular urban furniture of the 1950s.

Project name:
Transfer terminal of public transport Mnichovo Hradiště
Client:
The town of Mnichovo Hradiště
Address:
Jana Švermy, Dvořákova, Mnichovo Hradiště
Type:
public buildings
Competition:
2017 - 1st place in the invited competition / conceptual study
Realization:
2019
Solved area:
9000 m2
Investment costs:
CZK 23 million
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Jakub Herza
landscape solutions - symbio studio / Marie Gelová
transport solutions - Květoslav Syrový
Revitalization of the URAN Administration Building in Liberec

Revitalization of the URAN Administration Building in Liberec 2019

The proposal for the renovation of the perimeter cladding of the URAN administration building follows in principle on its original solution. It does not change the small scale of the composite parts of the cladding, it maintains the same ratio between the glazed and solid parts of the facade, it keeps the same proportions of windows and a significant horizontal division of the facade. The design also follows the original tectonic composition system. However, thanks to a different facade cladding material, the overall impression created by the house changes significantly.

The facade is lined with galvanized sheet metal. The surface of the facade is divided by the shadows of cornices, by windows, but also by individual pieces of sheet metal, joints between them, the grid of anchorages. The surface of the galvanized parts flashes in the light, the reflections differ in each plate. The house reflects and changes the changing light of the surroundings.

At the same time, the facade solution works with different depths of detail corresponding to the distances from which the building can be seen. Significant horizontal division and URAN inscriptions are visible at a distant view when arriving from the city center on the street 1. máje, when passing the highway from Prague and Zittau. Details of the pillar cladding, the canopy above the entrance and the individual torx heads of the sheet metal mounting bolts are visible at the entrance to the vestibule.

The presented facade solution also raises questions that the current solution has overlooked. Among them, the emphasis on the entrance to the building and the peculiarity of creating a unique building from an indifferent 1970s office building. A building, which reacts to the specific situation.

Project name:
Comprehensive revitalization of the administrative building "Uran"
Client:
Statutory city of Liberec
Address:
1. máje, Liberec
Type:
public administration and community
Competition:
2019 - 1st place in the invited architectural competition
Project status:
project in progress
Enclosed room:
12900
GFA:
3840
Investment costs:
50 mil. Kč
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Vojtěch Ružbatský
statics - KCE statika a dynamika staveb / Vít Hušek
cost calculation - Propos Liberec
energy specialist - PORSENNA / Michal Čejka
Construction of the Andromeda apartment complex

Construction of the Andromeda apartment complex 2019

This is a design of the residential complex of 500 flats in the vicinity of the KVP housing estate on the outskirts of Košice. Three lines are inserted into the sloping terrain of the area. Two lines of houses and one line of the street between them. The curves of the lines respond to the shape and morphology of the plot. The line of towers is adjacent to the tall high-rise blocks, the line of lower apartment buildings is adjacent to the park in the valley. The park square is located in the southern part of the design. The whole development culminates towards Moskevská třída, where the height of the towers reaches the height of the neighboring buildings. The line of towers leaves the possibility of vistas, the line of low houses leaves the possibility of passage.

The layout of houses offers a high quality of a wide range of apartments, the vast majority of which are oriented in two directions and all have a loggia.

Project name:
Construction of the Andromeda apartment complex
Client:
Andromeda Invest, s.r.o.
Address:
AVP housing estate, Košice
Competition:
2019 - 1st place in the invited architectural competition
Project status:
completion
Solved area:
47600 m2
Enclosed room:
240500
GFA:
74300
Investment costs:
CZK 1.8 billion, 507 housing units
Team:
re:architekti / Michal Kuzemenský, David Pavlišta, Ondřej Synek, Jan Vlach, Jiří Žid
Kateřina Gloserová, Vojtěch Ružbatský, Dušan Sabol
landscape solutions - symbio studio / Marie Gelová, Pavla Drbalová
transport solutions - Květoslav Syrový